[email protected]
banner

Requirements For Concrete In Wet Process Bored Pile

Pile foundations are used in the following situations when there is a layer of weak soil at the surface.This layer cannot support the weight of the building, so the loads of the building have to bypass this layer and be transferred to the layer of stronger soil or rock that is below the weak layer.

Get Price

NEED A QUESTIONS?

If you are interested in our products, or have any questions for us, you can click the button below

Chat Online